Retaining Wall Repair Continued
This past February AD Masonry returned to replace another segment of the retaining wall that runs behind 4 apartments on the north side. (See previous post.)
This past February AD Masonry returned to replace another segment of the retaining wall that runs behind 4 apartments on the north side. (See previous post.)
This past October AD Masonry removed and rebuilt part of a retaining wall that runs behind 4 apartments on the north side. It is one of two walls that hold […]
This past summer we had our usual picnic on August 26. We were blessed with a downpour which led to a beautiful double rainbow. Everyone was able to remain dry […]
Welcoming Spring here at Rockhaven! This year we have many projects planned. We will be replacing an old wood and mesh fence with a black metal one, we will rebuild […]
We have been surrounded by starlings as they spend a couple weeks if not longer as a regular stop on their migration. Starlings are renowned for their synchronized flying. In […]
Loved catching this rare double-rainbow in the sky over Rockhaven. We don’t get rainbows here often, it was so fun to see! It reminds us of the beautiful poem titled […]
For the past 3 weeks we have been visited every day by a majestic great blue heron. It flies in and walks around the property. It even perched on the […]
You must be logged in to post a comment.